Member of Wei Qun Cutting Tools Group · ISO 9001:2015 ga01@teamstarmfg.com
ENGINEERING RFQ GUIDE

Industrial machine knife RFQ preparation guide

A complete drawing can speed up review, but it is not mandatory. A physical sample, old-blade photographs or documented machine application can also start the enquiry.

STARTING POINT

Choose the route that matches the available information

Whether the enquiry begins with a drawing, sample or application, our engineering team first reviews manufacturability and identifies missing information.

01 DRAWING

Drawing-based manufacture

Use when a controlled drawing, CAD file or dimensional sketch is available.

Primary reference
Drawing number, revision and units
Key details
Overall dimensions, thickness, mounting interfaces and controlled tolerances
Also include
Processed material, machine information, quantity and current issue
Start from a drawing
02 SAMPLE

Physical-sample replication

Use when an old blade, unused sample or equipment-specific part is available.

Primary reference
Physical sample and photographs of both sides
Key details
Mounting position, edge condition, wear pattern and known dimensions
Also include
Machine make and model, processed material and sample availability
Start from a sample
03 APPLICATION

Application review

Use when the requirement begins with a machine, processed material or cutting problem.

Primary reference
Machine make, model and operating method
Key details
Processed material, mounting method, operating frequency and current failure
Also include
Installation-space dimensions, photographs, quantity and target service life
Start from an application
DRAWING CHECKLIST

Information to show on a technical drawing

Mark the characteristics that control fit, cutting performance and inspection. Tolerances or materials not yet confirmed can be labelled “for review”.

  1. 01
    Overall geometryLength or outside diameter, width, thickness and profile dimensions
  2. 02
    Mounting interfacesBores, slots, countersinks, pitch dimensions and reference datums
  3. 03
    Edge definitionCutting-edge position, bevel direction and controlled edge geometry
  4. 04
    Controlled requirementsApplicable tolerances, material or hardness requirements and surface requirements
  5. 05
    Document controlDrawing number, revision, units, quantity and approval status
WITHOUT A DRAWING

Photographs and measurements that support initial review

Full bladeFront, back and edge views with a scale reference
Mounting areaBores, slots, shoulders, mating parts and installation orientation
Machine identificationMachine nameplate, make, model and blade location
Wear and failureClose photographs of wear, chipping, deformation or cut-quality problems
MANUAL ENGINEERING REVIEW

What happens after submission

Our engineering team defines the manufacturing plan and quotation from the geometry, material, heat treatment, machining, grinding and inspection requirements.

01RFQ registrationThe enquiry and uploaded files are assigned an independent RFQ reference
02Information reviewEngineering checks the manufacturing references and identifies missing controlled information
03Technical clarificationQuestions on geometry, application, acceptance or sample validation are confirmed
04Process and quotationThe applicable process route, price and lead time are prepared after manual review
Why Teamstar does not provide instant automated pricing

A single tolerance, material or inspection requirement can change the manufacturing route and total cost, so quotation is reviewed against the blade, application and acceptance criteria.